Print or save this page as PDF using your browser's print function (Ctrl/Cmd + P)
Australia - FSANZ Food Standards - AS 1851 - WHS Act - Disability Standards
FSANZ Food Standards Code
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Coolroom temperature log (5°C or below) | Twice daily | |||
| Freezer temperature log (-18°C or below) | Twice daily | |||
| Display fridge temperature verification | Twice daily | |||
| Hot holding temperature check (60°C or above) | Every 2 hours | |||
| Cold holding temperature check (5°C or below) | Every 2 hours | |||
| Cooking temperature verification | Each batch | |||
| Cooling process monitoring (21°C in 2hrs, 5°C in 4hrs) | During cooling | |||
| Reheating temperature verification (60°C) | Each reheating |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Stock rotation (FIFO) check | Daily | |||
| Date marking verification | Daily | |||
| Cross-contamination prevention audit | Daily | |||
| Raw meat storage (below ready-to-eat) | Daily | |||
| Allergen management verification | Per shift | |||
| Food receiving inspection | Each delivery | |||
| Dry storage organisation (150mm off floor) | Weekly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Sanitiser concentration test | Per shift | |||
| Two-sink sanitisation setup verification | Per shift | |||
| Dishwasher temperature verification (77°C rinse) | Per shift | |||
| Food contact surface cleaning | Every 4 hours | |||
| Cutting board sanitisation | Between uses | |||
| Deep cleaning of equipment | Weekly | |||
| Ice machine cleaning and sanitisation | Weekly/Monthly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Staff handwashing compliance | Ongoing | |||
| Food Safety Supervisor certification | As required | |||
| Food handler training records | Upon hire/Refresh | |||
| Employee illness policy compliance | Daily | |||
| Proper glove use verification | Ongoing | |||
| Hair restraint compliance | Daily |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Pest activity inspection | Daily | |||
| Professional pest control service | Monthly | |||
| Door seal and flyscreen check | Weekly | |||
| Waste area inspection | Daily | |||
| Floor drain maintenance | Weekly |
AS 1851 / State Fire Regulations
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Grease filter visual inspection | Daily | |||
| Grease filter cleaning | Weekly or as needed | |||
| Hood interior cleaning | Weekly | |||
| Kitchen hood system cleaning (by certified) | Monthly/Quarterly | |||
| Ductwork cleaning (based on cooking volume) | Monthly to Annual | |||
| Grease trap inspection | Weekly | |||
| Exhaust fan operation check | Daily | |||
| Make-up air system verification | Monthly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Kitchen fire suppression system visual inspection | Daily | |||
| Fire suppression nozzle alignment check | Monthly | |||
| Manual activation point accessibility | Monthly | |||
| Fire suppression system inspection | Semiannual | |||
| Gas/electric interlock test | Semiannual |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Wet chemical (ABF) extinguisher visual inspection | Monthly | |||
| Fire extinguisher accessibility check | Monthly | |||
| Fire extinguisher annual maintenance | Annual | |||
| Staff training on fire extinguisher use | Annual |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Deep fryer thermostat calibration | Monthly | |||
| Grease buildup inspection on equipment | Daily | |||
| Clearance from combustibles check | Monthly | |||
| Gas connection and hose inspection | Quarterly | |||
| Chargrill/char broiler cleaning | Daily/Weekly |
AS 1851 / NCC 2022
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Fire indicator panel inspection | Monthly | |||
| Smoke detector functional test | Quarterly | |||
| Fire alarm system annual inspection | Annual | |||
| Fire alarm monitoring verification | Annual |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Fire extinguisher visual inspection | Monthly | |||
| Sprinkler system visual inspection | Monthly | |||
| Fire hose reel functional test | Monthly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Exit sign illumination check | Monthly | |||
| Emergency lighting functional test | Monthly | |||
| Emergency lighting 90-minute test | Annual | |||
| Exit path clearance verification | Daily | |||
| Fire door self-closing function | Monthly | |||
| Fire drill (staff) | Annual |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| HVAC filter replacement | Monthly/Quarterly | |||
| Refrigeration unit condenser cleaning | Quarterly | |||
| Coolroom evaporator coil cleaning | Quarterly | |||
| Refrigerant leak check | Annual | |||
| Kitchen ventilation airflow balance | Annual |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| RCD (safety switch) testing | 6 Months | |||
| Portable appliance testing (PAT) | Annual | |||
| Hot water temperature check (50°C delivery) | Monthly | |||
| Grease trap/arrestor cleaning | Monthly/Quarterly | |||
| Backflow prevention device inspection | Annual |
WHS Act 2011
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Wet floor/slip hazard inspection | Ongoing | |||
| Anti-slip mat condition check | Weekly | |||
| Sharp object safety (knife storage) | Daily | |||
| Hot surface warning labels | Monthly | |||
| Burns prevention training | Annual | |||
| Proper footwear compliance | Daily |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Safety Data Sheet (SDS) availability | Annual review | |||
| Chemical storage (separate from food) | Daily | |||
| Chemical labeling verification | Weekly | |||
| Staff chemical safety training | Annual | |||
| PPE availability for chemical handling | Monthly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Manual handling training | Annual | |||
| Heavy item storage (waist height) | Quarterly | |||
| Step stool/ladder condition | Monthly | |||
| Repetitive strain hazard assessment | Annual |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| First aid kit inspection | Monthly | |||
| Burns kit availability (kitchen specific) | Monthly | |||
| AED inspection and battery check | Monthly | |||
| Emergency contact list update | Quarterly | |||
| Emergency evacuation procedure review | Annual |
Disability Standards 2010
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Accessible entrance inspection | Monthly | |||
| Ramp and handrail condition | Monthly | |||
| Accessible parking signage | Monthly | |||
| Accessible route clearance (1000mm min) | Weekly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Accessible seating availability | Monthly | |||
| Table height compliance (750mm) | Quarterly | |||
| Aisle width between tables | Weekly | |||
| Counter service accessibility | Quarterly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Accessible toilet compliance | Monthly | |||
| Grab bar security check | Monthly | |||
| Accessible signage | Monthly |
State EPA / Local Council
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Grease trap/arrestor maintenance records | Monthly/Quarterly | |||
| Used cooking oil disposal records | Per pickup | |||
| Food waste disposal compliance | Daily | |||
| Recycling program compliance | Weekly | |||
| Hazardous waste disposal (chemicals) | As needed |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Water usage monitoring | Monthly | |||
| Leak detection and repair | Monthly | |||
| Energy consumption tracking | Monthly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Kitchen exhaust odour control | Monthly | |||
| Noise level compliance (outdoor areas) | As required |