Canada - NFC 2020 - CSA Z32 - CSA Z7396.1 - Provincial OHS - PHAC Guidelines
NFC 2020 / Provincial Fire Codes
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Fire Safety Plan review and update | Annual | |||
| Fire drill conduct (all staff) | Per shift annually | |||
| Fire department notification of plan changes | As needed | |||
| Staff fire safety training | Annual | |||
| Fire watch procedures when system impaired | As needed |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Fire alarm control unit inspection | Monthly | |||
| Manual pull station functional test | Monthly | |||
| Smoke detector functional test (sampling) | Annual | |||
| Duct smoke detector test | Annual | |||
| Fire alarm battery test | Monthly | |||
| Complete fire alarm system annual test | Annual |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Control valve position verification | Weekly | |||
| Waterflow alarm test | Quarterly | |||
| Main drain flow test | Quarterly | |||
| Fire pump flow test | Annual | |||
| Spare sprinkler head inventory | Annual |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Fire door visual inspection | Monthly | |||
| Fire door operational test | Annual | |||
| Smoke barrier integrity inspection | Annual | |||
| Fire damper inspection | Annual | |||
| Smoke damper operational test | Annual |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Exit sign illumination check | Monthly | |||
| Emergency lighting 30-second test | Monthly | |||
| Emergency lighting 1-hour discharge test | Annual | |||
| Generator-backed emergency light test | Monthly |
Health Canada / CSA Standards
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Ventilator preventive maintenance | Per MFR | |||
| Defibrillator functional check | Daily | |||
| Defibrillator comprehensive service | Per MFR | |||
| Anesthesia machine maintenance | Per MFR | |||
| Patient monitoring equipment PM | Per MFR | |||
| Infusion pump calibration | Per MFR |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| X-ray equipment maintenance | Per MFR | |||
| CT scanner preventive maintenance | Per MFR | |||
| MRI equipment maintenance | Per MFR | |||
| Radiation safety survey | Annual | |||
| Dosimeter badge review | Monthly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Sterilizer biological indicator test | Each cycle | |||
| Sterilizer chemical indicator | Each load | |||
| Steam sterilizer Bowie-Dick test | Daily | |||
| Sterilizer preventive maintenance | Per MFR | |||
| Sterilizer validation | Annual |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Electrical safety test (patient care equipment) | Annual | |||
| Medical equipment performance verification | Per MFR | |||
| Equipment recall and alert review | Ongoing | |||
| Incoming inspection for new equipment | On receipt |
CSA Z7396.1 / Provincial Standards
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Medical gas area alarm panel test | Daily | |||
| Medical gas outlet pressure test | Annual | |||
| Zone valve box inspection | 6 Months | |||
| Medical gas pipeline identity verification | Annual | |||
| Medical gas quality testing | Annual |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Medical air compressor inspection | Monthly | |||
| Medical air quality test (particulates, dewpoint) | Quarterly | |||
| Medical vacuum pump inspection | Monthly | |||
| Medical vacuum system flow test | Annual |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Bulk oxygen system inspection | Per vendor | |||
| Manifold system inspection | Monthly | |||
| Reserve supply verification | Daily | |||
| Cylinder storage area compliance | Monthly |
CSA Z32:21 / CSA C282
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Emergency generator visual inspection | Weekly | |||
| Generator load test (30% minimum) | Monthly | |||
| Generator transfer test (10 seconds) | Monthly | |||
| Generator annual load bank test | Annual | |||
| Automatic transfer switch test | Monthly | |||
| UPS system inspection | Quarterly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Operating room air pressure verification | Daily | |||
| Isolation room negative pressure check | Daily | |||
| HEPA filter inspection (critical areas) | Annual | |||
| Air changes per hour verification | Annual | |||
| Temperature monitoring (OR 20-23°C) | Continuous | |||
| Humidity monitoring (OR 30-60%) | Continuous |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Hot water temperature check (>60°C storage) | Monthly | |||
| Thermostatic mixing valve inspection | Annual | |||
| Dead leg flushing | Weekly | |||
| Cooling tower Legionella test | Quarterly | |||
| Water quality testing | Quarterly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Electrical distribution board inspection | Annual | |||
| GFCI test | Monthly | |||
| Isolated power system test (ORs) | Monthly | |||
| Line isolation monitor check | Daily | |||
| Hospital-grade receptacle test | Annual |
PHAC / Provincial Health Guidelines
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Patient room terminal cleaning audit | Per discharge | |||
| High-touch surface disinfection | Per shift | |||
| Operating room terminal cleaning | After each case | |||
| Isolation room cleaning protocol | Per protocol |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Biomedical waste container inspection | Daily | |||
| Sharps container inspection | Daily | |||
| Biomedical waste storage area inspection | Weekly | |||
| Waste contractor compliance review | Annual |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Safety Data Sheet (SDS) register update | As changed | |||
| Emergency eyewash station test | Weekly | |||
| Emergency shower test | Monthly | |||
| Hazardous material storage inspection | Monthly | |||
| WHMIS training compliance | Annual |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Medication refrigerator temperature log | Twice daily | |||
| Vaccine storage monitoring (2-8°C) | Twice daily | |||
| Controlled substance storage check | Each shift | |||
| Expired medication check | Monthly |