πΈπ¬ Singapore β’ SCDF β’ BCA β’ MOM β’ NEA β’ Green Mark
SCDF Fire Safety Act
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Fire Safety Certificate (FSC) renewal | Annual (3-year from Apr 2026) | |||
| Fire Safety Manager (FSM) appointment | Ongoing | |||
| FSM refresher training | Every 3 years | |||
| Company Emergency Response Team (CERT) formation | Ongoing |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Fire alarm panel functional test | Monthly | |||
| Smoke/heat detector test (sampling) | Quarterly | |||
| Manual call point test | Quarterly | |||
| Full fire alarm system inspection (licensed) | Annual | |||
| Voice alarm system test | Monthly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Fire extinguisher visual inspection | Monthly | |||
| Fire extinguisher servicing (licensed) | Annual | |||
| Hose reel functional test | Quarterly | |||
| Sprinkler system visual inspection | Monthly | |||
| Sprinkler system full inspection | Annual | |||
| Fire pump test | Weekly / Annual |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Fire drill (full building evacuation) | Biannual | |||
| Staff fire safety awareness training | Annual | |||
| Emergency Response Plan (ERP) review | Annual | |||
| Evacuation route signage check | Quarterly | |||
| Emergency lighting test (30 min) | Monthly |
BCA Building Control
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Periodic Structural Inspection (PSI) | 5 years | |||
| Visual inspection of structural elements | Quarterly | |||
| Facade inspection (buildings >13m) | 5 years | |||
| External wall tile/cladding check | Annual |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Lift maintenance (BCA registered contractor) | Monthly | |||
| Lift safety inspection | Annual | |||
| Lift emergency phone test | Monthly | |||
| Lift emergency lighting test | Monthly | |||
| Lift fireman's operation test | Quarterly | |||
| Escalator/travellator inspection | Annual |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Accessible route condition check | Quarterly | |||
| Accessible toilet facilities check | Monthly | |||
| Tactile ground surface indicator (TGSI) | Quarterly | |||
| Lift accessibility features (braille, audible) | Annual | |||
| Accessible parking spaces signage | Annual |
SS 553/554 / BCA Green Mark
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Air handling unit (AHU) inspection | Quarterly | |||
| Air filter replacement | Monthly / Quarterly | |||
| Fresh air intake inspection | Quarterly | |||
| Chiller inspection and maintenance | Quarterly | |||
| Cooling tower maintenance | Monthly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Indoor air quality monitoring | Quarterly | |||
| CO2 level verification (<1000 ppm) | Quarterly | |||
| Relative humidity monitoring (40-70%) | Quarterly | |||
| Temperature comfort check (23-26C) | Quarterly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Cooling tower registration with NEA | One-time | |||
| Heterotrophic Plate Count (HPC) test | Monthly | |||
| Legionella bacteria test | Quarterly | |||
| Submit water quality results to NEA | Monthly (by 14th) | |||
| Hot water storage temperature (>60C) | Monthly |
SS 638 / LEW
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Licensed Electrical Worker (LEW) inspection | 5 years | |||
| Electrical installation certificate renewal | 5 years | |||
| Electrical panel inspection | Annual | |||
| Thermal imaging of electrical connections | Annual |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Emergency generator load test | Monthly | |||
| Generator annual load bank test | Annual | |||
| Generator fuel system inspection | Monthly | |||
| UPS battery inspection | Quarterly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Emergency lighting test | Monthly | |||
| Exit sign illumination check | Monthly | |||
| Common area lighting check | Monthly | |||
| Carpark lighting check | Monthly |
NEA / BCA Green Mark
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Mozzie Wipeout inspection | Weekly | |||
| Check and remove stagnant water | Daily | |||
| Roof gutter and drain cleaning | Weekly | |||
| Document vector control activities | Weekly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| General waste area cleanliness | Daily | |||
| Recyclable waste segregation | Daily | |||
| Bin center pest control | Weekly | |||
| Waste contractor compliance | Monthly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Building Energy Submission (BES) | Annual | |||
| Energy consumption monitoring | Monthly | |||
| BCA Green Mark maintenance (if certified) | Per certification | |||
| MELS (minimum energy) compliance | Ongoing |
MOM WSH Act
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Workplace Risk Assessment update | Annual | |||
| Safe Work Procedures review | Annual | |||
| Hazard identification walkthrough | Quarterly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| WSH Committee meeting | Quarterly | |||
| WSH Committee membership update | Annual | |||
| Workplace inspection by committee | Quarterly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| First aid kit inspection | Monthly | |||
| AED inspection and battery check | Monthly | |||
| First aider certification validity | Every 2 years | |||
| Emergency contact list update | Quarterly |
| Task / Inspection Item | Frequency | Date Completed | Initials | |
|---|---|---|---|---|
| Contractor WSH briefing | Per engagement | |||
| Permit-to-work system compliance | Per activity | |||
| Contractor insurance verification | Per engagement |