Governance · Cost oversight

Service catalog software that ties agreed rates to the work order.

Rate schedules that version. Quotations that snapshot agreed rates. Approvals that route by amount. Cost tied back to the work order on the same record.

WORK ORDER · WR-2026-1847 In progress Pre-work checklist signed
Quote Approval Linked work This record
CP

Chiller plant annual

London HQ · Plant room L-B2

Priority · High

Assignee

Marcus K. Marcus K.

Sunrise Facilities

Scheduled

26 Apr 2026

Duration 2 days

Site

London HQ

Plant room L-B2

Trade

Mechanical

Annual PM

Activity

Work order opened 18 Apr 2026 · Ana P.
Quotation SQ-2026-0042 linked 19 Apr 2026 · Marcus K.
Quotation approved · cost stamped on record 20 Apr 2026 · Ana P.
Pre-work checklist signed 25 Apr 2026 · Marcus K.

Service cost

Approved

Approved quotation

SQ-2026-0042

Approved cost

$2,223.60

Approver
Ana P. Ana P. · Facilities manager
Approved 20 Apr 2026 · 11:42
Quotations on record 1 approved
Source schedule London HQ: ACMV 2026 Rev 2
Same record, no export

The work order knows its approved quote, its approved cost, and who approved it. No cross-system reference. No paste.

Quotations snapshot the agreed rate at submission. Replay the quote exactly, even after the schedule revises.

The work order record carries the approved quotation, the approver, and the approved cost. Same record, not an export.

Small quotes auto-approve under your threshold. Big ones route by role. One approvals inbox across quote, permit, visit, and work.

01 · On the record

Your rate schedules stop living in Excel.

Load agreed rates by contract: contractor, contract reference, effective dates, line items by trade. The catalog is queryable, versioned, and visible across your team. When a rate changes, you revise the schedule. Old rates stay in history. Quotations submitted before the revision replay the old rate exactly.

Revisions preserve history. Old rates replay on old quotes.
Assign a schedule to specific contractors. Scope stays yours.
Bulk import rate items by CSV. Transactional, all-or-nothing.
Rate schedule Active Rev 2 · revised 15 Mar 2026

London HQ: ACMV 2026

Sunrise Facilities · Contract FM-2026-ACMV-012 · Effective 2026-01-01 to 2026-12-31

Code Description Unit Unit rate Status
ACMV-INSP-Q Quarterly inspection of central AHU visit $240 Active
ACMV-FILT-P Primary filter replacement each $45 Active
ACMV-CLEAN-M Monthly coil cleaning visit $180 Active
ACMV-REPAIR-H Labor, corrective repair hour $85 Active
ACMV-EMERG-C Emergency callout surcharge each $150 Active
32 rate items · updated 3 days ago · Sara T. 2 quotations drafted from this schedule this week
New quotation Draft

From London HQ: ACMV 2026 Rev 2

Linked to work order WR-2026-1847 · Chiller plant annual · Marcus K.

Line item Unit Qty Rate Total
ACMV-INSP-Q
Quarterly inspection
snapshotted · rev 2
visit 4 $240.00 $960.00
ACMV-FILT-P
Primary filter replacement
snapshotted · rev 2
each 12 $45.00 $540.00
ACMV-CLEAN-M
Monthly coil cleaning
snapshotted · rev 2
visit 3 $180.00 $540.00
Subtotal$2,040.00
Tax (9%)$183.60
Grand total$2,223.60

Will route to facilities manager.

Above your $500 auto-approve band.

02 · Quote from the record

No ad-hoc overrides. What was agreed is what gets quoted.

Pick the schedule. Select the line items. Enter quantities. The platform snapshots the unit rate, the unit, the description, and the code at that moment. Those values stamp onto the quotation. If somebody on your team tries to hand-edit a line rate, there is no path for that.

Line rates stamp at submission. No per-quote overrides.
Subtotal, tax, and grand total calculate from locked inputs.

03 · Same record

The work order shows the approved quote, the approver, the approved cost. Not a cross-system reference.

When you create a quotation, link it to the work order it covers. Once approved, the work order detail page carries a quotation summary: count of quotations, approval status, approved quotation ID, approved cost, the approver, the date. No export. No cross-reference to paste into another tool. The cost side of the work order and the work side of the work order are the same record.

On the work order

Approved quotation

SQ-2026-0042
Approved

Approved cost

$2,223.60

Approver
Ana P. Ana P.
Approved 20 Apr 2026
Source schedule London HQ: ACMV 2026 Rev 2
Same record, no export

04 · Approvals

Small quotes auto-approve under your threshold. Larger ones route by role.

A $40 pest-control callout auto-approves. A $1,200 lift maintenance quotation routes to your facilities manager. A $20,000 chiller overhaul routes to the owner. Every quotation lands in the same approvals inbox your team already uses for work orders, visitor decisions, and permit approvals. One place to approve. One audit trail.

Approvals inbox 7 pending
Filter: All types
SQ-2026-0091 Quotation

London HQ: ACMV 2026 · $1,820.00

From Marcus K. · Sunrise Facilities · submitted 2h ago

PTW-2026-0218 Permit

Hot work · Priya S. crew (3)

Requires safety officer sign-off · submitted 45m ago

WR-2026-1902 Work order

Overtime authorization

Requested by Sara T. · 1h ago

VIS-2026-0924 Visitor

Flagged match · Marcus K.

Decide on arrival · live

SQ-2026-0089 Auto-approved

Berlin Campus: Electrical 2026 · $480.00

Reviewed by System · under $500 band · 3h ago

05 · You set the bands

You decide what auto-approves and what escalates.

Three bands, five bands, whatever fits your governance. Under $X auto-approves. $X to $Y routes to facilities manager. Above $Y routes to owner. Change the bands as your contracts shift. Your procurement lead owns the config. Nobody else edits it.

Also reported

Rate drift by schedule: your schedule rate compared with how approved quotations used it across the period. Not settled actual cost. When the catalog and the practice drift, you see it.

Approval thresholds · service catalog

Grand total (subtotal plus tax) at submission

Last updated by Ana P. · 18 Apr 2026
Band 1 Under $500
Auto-approve system actor
Band 2 $500 to $5,000
Route to Facilities manager
Band 3 $5,000 to $20,000
Route to Operations manager
Band 4 Above $20,000
Route to Facilities owner

See the platform

The cost governance your facilities team already needed.

30-minute demo. Your real schedule, your real approval pain. No pitch slides.